Murray Rose – NSW

NSW – JANUARY 2019
Industry | Electrical & Communications |
Builder | Lendlease |
Project Duration | 12 Months |
Scope of Project |
Supply & installation of open generator set and ancillary equipment on level 6 roof top plant room, complete with 10,00 bulk tank with fuel transfer system located in tank chamber room on basement B3 |
Generator Supplied |
HTW-1390 T5 Open Generator Set |
Additional Services |
Supply of Inlet & Discharge Sound Attenuated Ventilation system, Primary & Secondary Exhaust system & 10,000 Bulk Tank with remote fill point and automatic fuel transfer system. |
GPA Involvement |
This was a Design and Construct project. The limited space and low ceiling height for the allocated ventilation and exhaust system created challenges to overcome in the design process to be able to successfully achieve the required airflow and noise level (75dBA@1m) requirements for the project. |